As you know, we have been waiting for CSX to begin the engineering design that will provide the specifications and final cost figures for the installation of four-quad gates at the Voorheesville railroad crossings. At the December 16, 2014 Voorheesville Village Board meeting, Mayor Conway reported that the firm retained by CSX to perform the engineering design had contacted the Village to begin the process. The Village is developing a work agreement with the consultant.